Senior Fitness - Exercise and Nutrition for Aging Men and Women
FREE Article Feed for your website.
Home Ownership Magazine
Party Planning Information
Article Marketing Resources
Bio-Medical Research Article Database
Informative Articles on Life, Love and Happiness
Tutorials on Business to Writing
Famous Quotes from Famous People
Song Lyric Information
New US Patent Information
Comprehensive List of Content by Category
Online Auctions and Shopping Related Articles
Article Search
Most Recent Articles
Title: Intermittent stress augmentation pacing for cardioprotective effect
Patent Number: 7,437,191 Issued on 10/14/2008 to Pastore,   et al.

Title: Drum lid for minimal liquid carryover in a vacuum system
Patent Number: 6,767,380 Issued on 07/27/2004 to von Stackelberg, Jr.

Title: Method and apparatus for chemical mechanical planarization
Patent Number: 6,767,428 Issued on 07/27/2004 to Gotkis,   et al.

Title: Electronic device including a self-assembled monolayer, and a method of fabricating the same
Patent Number: 7,132,678 Issued on 11/07/2006 to Kagan,   et al.

Title: Oblique angled suspension caster fork for wheelchairs
Patent Number: 6,892,421 Issued on 05/17/2005 to Cooper,   et al.

Title: Methods and systems for implementing a profitability model
Patent Number: 7,124,104 Issued on 10/17/2006 to Casciano,   et al.

Title: Process for the preparation of aryl-pyridinyl compounds
Patent Number: 6,765,097 Issued on 07/20/2004 to Giordano,   et al.

Title: Removable mother/daughter peripheral card
Patent Number: 6,893,268 Issued on 05/17/2005 to Harari,   et al.

Title: Feed conveyor/rock trap and header drive for an agricultural combine
Patent Number: 6,705,067 Issued on 03/16/2004 to Schroeder,   et al.

Title: Computer-generated hologram and its fabrication process, reflector using a computer-generated hologram, and reflective liquid crystal display
Patent Number: 7,054,044 Issued on 05/30/2006 to Hamano,   et al.

Title: Station identification for a local area augmentation system on a visual display
Patent Number: 6,950,036 Issued on 09/27/2005 to Snodgrass,   et al.

Title: Phenol resin forming material for pulley used in motor vehicles and phenol resin pulley for motor vehicles
Patent Number: 6,765,051 Issued on 07/20/2004 to Yazawa,   et al.

Title: Method and apparatus for dithering or undithering data words in a data stream
Patent Number: 7,054,037 Issued on 05/30/2006 to Mevissen

Title: Methods and apparatus for controlling a motor/generator
Patent Number: 7,116,073 Issued on 10/03/2006 to Sorkin

Title: Unified control of vehicle dynamics using force and moment control
Patent Number: 6,892,123 Issued on 05/10/2005 to Hac

Title: Polygon mirror and optical scanning device having the same
Patent Number: 7,054,047 Issued on 05/30/2006 to Tamaru

Title: Copy protection apparatus and method
Patent Number: 6,865,553 Issued on 03/08/2005 to Morito,   et al.

Title: Stacked polysilicon layer for boron penetration inhibition
Patent Number: 6,762,454 Issued on 07/13/2004 to Ibok,   et al.

Title: Optical sub-assembly module for suppressing optical back-reflection and effectively guiding light from light source to optical waveguide
Patent Number: 6,945,710 Issued on 09/20/2005 to Chen,   et al.

Title: Low-contaminative hose and rubber composition for use in making the same
Patent Number: 6,737,480 Issued on 05/18/2004 to Ikeda,   et al.

Title: Cup lid having combined straw slot depression and tear back lid retainer
Patent Number: 6,948,633 Issued on 09/27/2005 to Freek,   et al.

Title: High-accuracy capacitor digital-to-analog converter
Patent Number: 7,123,072 Issued on 10/17/2006 to Bu,   et al.

Title: Apparatus for adaptively adjusting a data receiver
Patent Number: 7,123,046 Issued on 10/17/2006 to Keeth

Title: Method of making multilevel MEMS structures
Patent Number: 6,861,363 Issued on 03/01/2005 to Harchanko,   et al.

Title: Marine vessel monitoring system
Patent Number: 6,816,088 Issued on 11/09/2004 to Knoska,   et al.

Title: Router bit system
Patent Number: 7,140,817 Issued on 11/28/2006 to Phillips,   et al.

Title: Concrete stamping apparatus
Patent Number: 7,140,804 Issued on 11/28/2006 to Gregg

Title: Imaging apparatus having a carrier support and drive arrangement
Patent Number: 7,140,793 Issued on 11/28/2006 to Cook

Title: Joint structure for power transmitting member and method for producing the same
Patent Number: 7,140,800 Issued on 11/28/2006 to Sugiyama,   et al.

Title: Casing arrangement
Patent Number: 7,140,836 Issued on 11/28/2006 to Balsdon

Title: Rotary-die-method and fill wedge for producing capsules, in particular soft capsules
Patent Number: 6,935,090 Issued on 08/30/2005 to Stolz

Title: Restraint coupling
Patent Number: 6,962,394 Issued on 11/08/2005 to Anthony,   et al.

Title: Split and merge design flow concept for fast turnaround time of circuit layout design
Patent Number: 6,898,770 Issued on 05/24/2005 to Boluki,   et al.

Title: Corner cooled turbine nozzle
Patent Number: 7,140,835 Issued on 11/28/2006 to Lee,   et al.

Title: Attachment for forming shapes following excavation
Patent Number: 7,140,831 Issued on 11/28/2006 to Wollgast,   et al.

Title: Optical disc drive and optical disc discriminating method
Patent Number: 6,956,801 Issued on 10/18/2005 to Horimoto

Title: Method of drilling lateral wellbores from a slant well without utilizing a whipstock
Patent Number: 6,964,308 Issued on 11/15/2005 to Zupanick

Title: Capacitor for semiconductor device, manufacturing method thereof, and electronic device employing the same
Patent Number: 7,105,401 Issued on 09/12/2006 to Lee,   et al.

Title: Flexure mechanism for interface device
Patent Number: 7,193,607 Issued on 03/20/2007 to Moore,   et al.

Title: Aggregate dryer burner with compressed air oil atomizer
Patent Number: 6,969,249 Issued on 11/29/2005 to Marino,   et al.

Title: Manufacturing method of semiconductor device
Patent Number: 7,105,400 Issued on 09/12/2006 to Imai,   et al.

Title: Semiconductor constructions, and methods of forming semiconductor constructions
Patent Number: 7,105,402 Issued on 09/12/2006 to McQueen,   et al.

Title: Shaped anchor
Patent Number: 7,140,826 Issued on 11/28/2006 to Powers,   et al.

Title: Roadway for decelerating and/or accelerating a vehicle including an aircraft
Patent Number: 6,969,213 Issued on 11/29/2005 to Rastegar,   et al.

Title: Ignition system for internal combustion engine and ignition method of fuel charged in a fuel chamber
Patent Number: 6,796,299 Issued on 09/28/2004 to Isono

Title: Dual seat valve
Patent Number: 6,796,323 Issued on 09/28/2004 to Taylor

Title: Damper system with sealing plug
Patent Number: 6,796,328 Issued on 09/28/2004 to Myles

Title: Multiple person high altitude recycling breathing apparatus
Patent Number: 6,796,307 Issued on 09/28/2004 to Hughson,   et al.

Title: Backup power system
Patent Number: 7,042,108 Issued on 05/09/2006 to Farkas

Title: Methods of cleaning vaporization surfaces
Patent Number: 6,796,313 Issued on 09/28/2004 to Marsh

Title: System and method for searching for duplicate data
Patent Number: 6,795,903 Issued on 09/21/2004 to Schultz,   et al.

Title: Shared memory interface with conventional access and synchronization support
Patent Number: 6,795,901 Issued on 09/21/2004 to Florek,   et al.

Title: Line control arrangement for continuously variable valve timing system
Patent Number: 6,796,276 Issued on 09/28/2004 to Kim

Title: Method and apparatus for determining a match address in an intra-row configurable cam device
Patent Number: 6,795,892 Issued on 09/21/2004 to Pereira,   et al.

Title: Mixture fitting for a combustible gas burner system
Patent Number: 6,796,302 Issued on 09/28/2004 to Butler,   et al.

Title: Ironing board ajdustable in height
Patent Number: 6,796,059 Issued on 09/28/2004 to Denisart,   et al.

Title: Selective memory controller access path for directory caching
Patent Number: 6,795,897 Issued on 09/21/2004 to Benveniste,   et al.

Title: Method for restarting an apparatus if the integrity of data in a memory is lost during micro-outage of power supply
Patent Number: 6,795,913 Issued on 09/21/2004 to Ricordel

Title: Duct repairing material, repairing structure, and repairing method
Patent Number: 6,796,334 Issued on 09/28/2004 to Ishikawa,   et al.

Title: Optical viewer instrument with photographing function
Patent Number: 6,914,636 Issued on 07/05/2005 to Hirunuma,   et al.

Title: Internal combustion engine with valve train
Patent Number: 6,796,281 Issued on 09/28/2004 to Shimoyama,   et al.

Title: Method for diagnosing a network
Patent Number: 6,795,941 Issued on 09/21/2004 to Nickels

Title: Priority coloring for VLSI designs
Patent Number: 6,795,961 Issued on 09/21/2004 to Liebmann,   et al.

Title: Methods and apparatus for ManArray PE-PE switch control
Patent Number: 6,795,909 Issued on 09/21/2004 to Barry,   et al.

Title: Prevention of power state change in response to chassis intrusion when computer system is not in powered up power state
Patent Number: 6,795,926 Issued on 09/21/2004 to Matula,   et al.

Title: Ignition spark enhancing device
Patent Number: 6,796,298 Issued on 09/28/2004 to Kiker

Title: Intake pressure sensor arrangement for engine
Patent Number: 6,796,291 Issued on 09/28/2004 to Suzuki,   et al.

Title: Single revolution cam engine
Patent Number: 6,796,284 Issued on 09/28/2004 to Von Wielligh

Title: Multiple traps after faulty access to a resource
Patent Number: 6,795,937 Issued on 09/21/2004 to Harris,   et al.

Title: Method and system for setting optical drive write strategies
Patent Number: 6,915,374 Issued on 07/05/2005 to Pereira

Title: Pulmonary aerosol delivery device and method
Patent Number: 6,796,303 Issued on 09/28/2004 to Zimlich, Jr.,   et al.

Title: Vertical internal combustion engine
Patent Number: 6,796,282 Issued on 09/28/2004 to Tsubouchi,   et al.

Title: Inductor and method for producing the same
Patent Number: 6,909,350 Issued on 06/21/2005 to Uriu,   et al.

Title: Diaphragm system
Patent Number: 6,796,336 Issued on 09/28/2004 to Ijspeert

Title: Protective packing structure for a cylindrical object and fitted with a fastener
Patent Number: 6,796,333 Issued on 09/28/2004 to Birkel,   et al.

Method for constructing a self anchored suspension bridge Number:7,415,746 from the United States Patent and Trademark Office (PTO) owispatent

Home    Author Login    Submit Article    Article Search    Add Your Link    Edit Your Link    Contact Us    Advertising    Disclaimer

   

 
Web LinkGrinder.com

Top Breaking News
     Greek, Cypriot Leaders Resume Unification Talks in Nicosia by Nathan Morley
     Indonesia Tobacco Sales Grow, Raising Health Fears
     South Korea Allows Top Defector to Travel Overseas by VOA News

Title: Method for constructing a self anchored suspension bridge

Abstract: A method for constructing a suspension bridge in places where it is not feasible to construct permanent earth anchorages land at either or both ends of the suspension bridge span is disclosed. The method of constructing the self-anchored suspension bridge comprises the use of preexisting permanent structures solely or in combination with minimum temporary structures to provide temporary anchor points for main suspension cables during construction. Once the suspension bridge span end structures are properly secured by a tensioning cable to the temporary structure or by a temporary connection to a permanent structure and the deck segment of pier table is lifted into place and tied down on an end support, the main suspension bridge cables are erected, suspenders are then erected from the main cable, and further construction of the bridge proceeds. Once the bridge deck segments are all erected and integrated with the end piers, temporary PT bars or cables connecting end supports to either preexisting or temporary structures are gradually released to transfer anchoring force back to the bridge deck. The temporary PT bars, cables and the temporary structures (if used) are then disassembled and removed.

Patent Number: 7,415,746 Issued on 08/26/2008 to Tao


Inventors: Tao; Jian Ren (Sunnyvale, CA)
Assignee: SC Solutions (Sunnyvale, CA)
Appl. No.: 11/292,497
Filed: December 1, 2005


Current U.S. Class: 14/77.1
Current International Class: E01D 21/00 (20060101)
Field of Search: 14/18,21,77.1


References Cited [Referenced By]

U.S. Patent Documents
1592685 July 1926 Schachenmeier
1785023 December 1930 Edwards et al.
2878498 March 1959 Gollnow
2914783 December 1959 Hoyden et al.
3255591 June 1966 Thornley
3673624 July 1972 Finsterwalder
3685074 August 1972 Marshall
3738112 June 1973 Grant
3753406 August 1973 Muller
3794433 February 1974 Shupack
3808624 May 1974 Barkdull, Jr.
3857130 December 1974 Sofronie
3864776 February 1975 Hedefine
3906687 September 1975 Schupack
4223495 September 1980 Peter
4451950 June 1984 Richardson
4457035 July 1984 Habegger
4464803 August 1984 Bonasso
4484425 November 1984 Muller
4535498 August 1985 Webster
4581860 April 1986 Berger
4615063 October 1986 Rolen
4631772 December 1986 Bonasso
4641816 February 1987 Kishida
4644978 February 1987 Bonasso
4685253 August 1987 Bitterly
4704754 November 1987 Bonasso
4884377 December 1989 Matt
5060332 October 1991 Webster
5070566 December 1991 Lin
5208932 May 1993 Muller
5493746 February 1996 Minakami
5513408 May 1996 Minakami
5539946 July 1996 Kawada
5615436 April 1997 Brown
5640732 June 1997 Diana
5655244 August 1997 Minakami
5784739 July 1998 Kawada
5896609 April 1999 Lin
6302735 October 2001 Jartoux
6523207 February 2003 Stubler
6681431 January 2004 Zivanovic
6715176 April 2004 Stubler
6728987 May 2004 Hinman
6817444 November 2004 Shinas
6832459 December 2004 Russell
Primary Examiner: Hartmann; Gary S
Attorney, Agent or Firm: Glenn; Michael A. Glenn Patent Group

Claims



The invention claimed is:

1. A method for constructing a self-anchored suspension bridge as part of a preexisting bridge, comprising the steps of: erecting two end supports and a center support for said suspension bridge, an end support being erected on either side of said center support; constructing a temporary structure founded on a foundation spaced away from, and proximate to, one end support of said suspension bridge; tensioning said end support that is proximate to said temporary structure with a cable suspended therebetween; forming temporary connections between another of said end support structures and said preexisting bridge; erecting main suspension bridge cables; erecting suspenders from said main cables; lifting box girder segments and adjusting said temporary cables as necessary; aligning and making up box girder section splices, including cross beams and a closure segment at an end support; lifting a pier table deck segment of said suspension bridge onto one end support and securing said deck segment to said support; connecting said deck segment with said preexisting bridge; once all of said box girder segments, closure segments, and deck segments are lifted and connected, gradually releasing said temporary connections at said end support structure; completing said bridge; and disassembling said temporary connections and said temporary structure.

2. The method of claim 1, said step of erecting suspenders further comprising the step of: adding temporary hangers if cross beams are welded after erection of steel boxes.
Description



BACKGROUND OF THE INVENTION

1.Technical Field

The invention relates to bridges. More specifically, the invention relates to construction of a self-anchored suspension bridge.

2.Discussion of the Prior Art

Heretofore, most of the suspension bridges were constructed using earth anchors. In such cases, cables are anchored to earth at both sides of the span over which the bridge is built.

However, it may be desirable to build a suspension bridge based on considerations of esthetic preference or site conditions or both, for example, where the soil condition is not ideal for building earth anchorages economically, such as across the San Francisco-Oakland East Bay, it has been decided to provide a self-anchored suspension bridge for the navigation span of the New San Francisco-Oakland Bay Bridge East Span.

SUMMARY OF THE INVENTION

A method for constructing a self-anchored suspension bridge is disclosed. The method of constructing the self-anchored suspension bridge comprises the construction of a temporary structure, which is used to secure an end support of the suspension bridge by means of a cable therebetween. Another end support of the suspension bridge is preferably secured by a preexisting structure, but may also be secured by a temporary structure. Once the suspension bridge span end structures are properly secured by a tensioning cable to the temporary structure or by a temporary connection to a permanent structure, a pier table deck segment is lifted into place and tied down on an end support. After that, the main suspension bridge cables are erected, suspenders are erected from the main cable, and further construction of the bridge proceeds. Once the bridge is completed, the temporary structure is disassembled.

BRIEF DESCRIPTION OF THE DRAWINGS

FIG. 1 is a schematic diagram showing a self-anchored suspension bridge according to the invention;

FIG. 2 shows a first step in the construction of a self-anchored suspension bridge according to the invention;

FIG. 3 shows a second step in the construction of a self-anchored suspension bridge according to the invention; and

FIG. 4 shows a third step in the construction of a self-anchored suspension bridge according to the invention;

DETAILED DESCRIPTION OF A PREFERRED EMBODIMENT

The invention provides an alternative method of constructing a self-anchored suspension bridge.

FIGS. 1A and 1B are schematic elevation and plan views of a self-anchored suspension bridge 15 according to the invention. A key problem with the construction of suspension bridges is the need to provide anchor points for the suspension bridge cables. Traditionally, these anchor point have been the earth anchorages and are located at both ends of the span across which the bridge is built. In the case of a self-anchored suspension bridge, such as the San Francisco-Oakland Self-Anchored Suspension Bay Bridge (Abbreviated as SAS thereafter), cables are supposedly anchored by the bridge deck carrying compressing force at both ends. Such self-anchor mechanism, however, does not exist until the bridge is fully assembled, because during construction, the bridge deck segments need to be supported by cables whereas not yet capable of providing the required anchor force for cables loaded by themselves. The broken chain needs to be connected by auxiliary structures. A straightforward solution is to construct a temporary bridge to support the bridge deck segments. Once the bridge segments are assembled and integrated with the end piers of the bridge, cables are erected and suspenders are installed. Then gravity force of the bridge deck is transferred onto cables by adjusting the suspenders' length and the temporary bridge is released and removed. However, in case where the bridge span is getting quite long over the deep water, such as SAS, constructing a temporary bridge itself become very challenging and too expensive. If there exist permanent structures can be utilized to provide all or part of the anchoring force for cables during construction, such costly temporary bridge can be avoided. As shown in FIGS. 1A and 1B that during construction, the main cable of a self-anchored suspension bridge 15 can be temporarily anchored by various means. On the left hand side of the bridge 15, cables are anchored at temporary structure 10 through temporary cables 12. It is relevant to point out that the foundation (footing and piles) of temporary structure 10 could be used afterwards to support a permanent approach bridge span. On the right hand side of the bridge 15 cables can be temporarily anchored using preexisting portions of the bridge, Frame 1. In case if Frame 1 alone is not sufficient, Frame 2 can be engaged using temporary connectors 17 to further provide required anchor force.

FIG. 2 shows a construction sequence beginning with a first step. In FIG. 2A, an elevation view is shown for the temporary structure as well as various bridge structures, i.e. end supports W2 and E2, and a center support T1. During construction, the end supports W2 and E2, as well as the center support T1 are built, including the pier tables for supports W2 and E2. The temporary structure 10 is also constructed as shown in FIG. 2B. To support t the temporary structure 10, a footing 20 is required. In some cases piles or rock sockets may be necessary to prevent the footing from sliding. The structure 20 could be utilized as the foundation for permanent approach bridge structures. The temporary structure 10 is preferably made of pre-cast concrete blocks 22 that have post-tensioning tendons there through and can be later easily dissembled and removed.

FIG. 3 shows a second step in the construction of the self-anchored suspension bridge. At a first part of step two, one deck segment 30 of the bridge is lifted onto end support E2 and is secured on support E2 via a tie down 32. The deck segment is connected with existing bridge structure Frame I using PT bars or cables 34, which can be initially tensioned, adjusted and released. If Frame 1 alone is not sufficient for providing the required anchoring force, the existing bridge structure Frame 2 can also be engaged by temporary connectors between Frame 1 and Frame 2. The cap beam of support W2 is tied with temporary structure 10 using PT bars or cables, and the cables are tensioned to the required initial forces.

FIG. 4 shows a third step in constructing a self-anchored suspension bridge. The main suspension bridge cables 40 are erected.

The suspenders 42 are then erected onto the main cables. Add temporary hangers if crossbeams are welded after the erection of steel boxes (not shown).

During a fourth step, the box girder segments are lifted and the temporary PT bars or cables are adjusted as necessary. To avoid damage to the preexisting permanent structures, W2, E2, Frame I and Frame 2 (if engaged) have to be kept well within elastic condition. It is then necessary to align and make up box girder section splices, including crossbeams (if welded in field), and a closure segment at support W2. Once all segments are lifted and connected, the temporary PT bars at support structure E2 are gradually released from the support E2 frame I connection. Before doing this, the tie downs at support E2 are first released so that the box girder can slide longitudinally on temporary bearings. The temporary PT bars or cables are then released and the suspenders are adjusted to the required length.

At step five, the bridge furnitures are constructed and bridge construction is continued until the bridge is finished. Concurrently, the temporary structure is disassembled and the pre-cast concrete blocks are removed.

The above construction sequence has the advantages of eliminating construction of temporary towers, bridges, as would be used in making a suspension bridge that was self-anchored. This saves construction cost and time.

Although the invention is described herein with reference to the preferred embodiment, one skilled in the art will readily appreciate that other applications may be substituted for those set forth herein without departing from the spirit and scope of the present invention. Accordingly, the invention should only be limited by the Claims included below.

*


Free Web Sudoku Puzzles.
Solve with your browser.
  2 9 4       3 8
8       9        
  3       7      
  9         3 8  
    2       7    
  5 8         4  
      8       9  
        1       5
1 4       3 8 2  
What is it?



Add Your Site · Terms Of Service · Privacy Policy


DISCLAIMER
Linkgrinder is a free service that searches the Internet and indexes all files found so that you may search quickly and easily for shared files. These files are created and made available individually by users whose identity we are not aware of and who we have no control over. In essence we function like a search engine tool; these files ARE NOT STORED OR SERVED BY OUR NETWORK. We are not responsible for any materials obtained by using our service. We do not monitor any of the contents of these files. These files may contain viruses, illegal materials, materials inappropriate for minors, offensive files and the like. BY USING OUR SERVICE, YOU ASSUME FULL RESPONSIBILITY FOR DOWNLOADING THESE MATERIALS AND WILL INDEMNIFY US FOR ANY DAMAGES THAT MAY BE INCURRED.

For More Specific Information VIEW OUR TERMS OF SERVICE.

Thank you and Enjoy!